How long does a home remodel take? A whole-house remodel typically takes 4 to 6 months of construction once demolition begins, and 6 months to over a year from first design meeting to final walkthrough (Landis Construction, 2026 Remodel Timeline). Smaller cosmetic projects can finish in about 12 weeks, while large structural transformations stretch to 11 months or more. Here’s a realistic timeline and what makes it move.
The number that surprises people is the pre-construction time. The months before demo often shape the schedule more than the build itself.
Want a realistic schedule for your Broward remodel? We’ll map it out before demo day.
How Long Does a Home Remodel Take by Scope?
How long a home remodel takes scales with scope. A whole-home renovation runs about 16 to 20+ weeks of construction, most landing in the 4 to 6 month range, while a cosmetic refresh finishes closer to 12 weeks and a major structural project can reach 11 months (Sims Builders, Whole-Home Timeline, 2026).
Single rooms move faster: a bathroom runs a few weeks, a kitchen a bit longer. When you chain several rooms into a whole-house project, the timelines overlap rather than simply add up, which is why a good schedule matters.
Don’t Forget the Design Phase
Before any demolition, the design and selection phase adds another 4 to 16 weeks — and locking in your selections during that window is the single most important thing you can do to keep the construction calendar on track. Every finish you haven’t chosen by demo day is a potential delay later.
What we tell clients: the remodels that finish on time are the ones where every tile, fixture, and cabinet was selected before demo started. Indecision mid-project is the most common self-inflicted delay we see.
So the honest full timeline is design (1 to 4 months) plus construction (3 to 6 months), which is why a whole-house remodel is realistically a 6-month to 1-year commitment start to finish. Since the kitchen and baths often set the pace, our guide to how long a bathroom remodel takes shows how a single room fits in.
Why Home Remodels Run Long
The usual culprits are predictable: material lead times, permitting, structural surprises in older homes, and mid-project scope changes. Custom cabinets, specialty tile, and windows can carry lead times of weeks to months, and in a busy market, trade availability adds its own drag.
Most of these are manageable with planning. Order long-lead items early, finalize the scope before demo, and build the permit window into the schedule. The cost side moves with the timeline too — see the full cost to remodel a house for how scope drives both.
How Long Does a Home Remodel Take in Fort Lauderdale?
In Fort Lauderdale and across Broward, whole-house remodels run in that same 4 to 6 month construction window, but two local factors shape it: permit processing and the age of coastal homes, which often reveal wiring, plumbing, or structural surprises once walls open. Build both into the plan and the calendar holds.
NJL General Services has remodeled homes across Broward for 15+ years. We’ll give you a phase-by-phase schedule up front, flag the long-lead items early, and keep the project moving instead of stalling on surprises.
Get a realistic remodel schedule and estimate
NJL General Services · Serving Fort Lauderdale & Broward County
3370 Beau Rivage Dr, Pompano Beach, FL 33064
Call: (754) 610-8806 · (561) 207-0354 · (754) 333-9107
Frequently Asked Questions
How long does a whole house remodel take?
About 4 to 6 months of construction once demolition begins, or 16 to 20+ weeks. Adding the design and permitting phase before demo, a whole-house remodel is realistically a 6-month to 1-year project from first meeting to final walkthrough.
How long does a cosmetic home remodel take?
A cosmetic refresh, paint, fixtures, and finishes without structural or layout changes, usually finishes in about 12 weeks. Keeping the existing layout and having materials on hand is what keeps a cosmetic project on the short end.
What is the longest phase of a home remodel?
Design and selections plus material lead times. The design phase alone adds 4 to 16 weeks before demo, and unfinished selections or long-lead custom items are the most common cause of delays once construction is underway.
Why do home remodels take so long?
Material lead times, permitting, hidden structural issues in older homes, and mid-project scope changes are the biggest factors. Ordering early, locking selections before demo, and planning the permit window remove most of the risk.
The Bottom Line: How Long Does a Home Remodel Take?
How long does a home remodel take? Plan on 4 to 6 months of construction for a whole house, about 12 weeks for a cosmetic refresh, and up to 11 months for a major structural project — plus 1 to 4 months of design before any of it starts. Selections and lead times, not the crew, usually decide whether you finish on time.
Lock your choices early, order long-lead items first, and build in the permit window, and your remodel lands on schedule. When you’re ready to plan yours, general contractor fort lauderdale starts with a free consultation.